Pile Test FAQs

Find answers to common questions about pile testing methods, procedures, equipment, and best practices.
Clear explanations to help you understand the essentials of foundation testing and engineering.

Pile Test Services

Q: How long does the testing process take?
A: The testing duration, excluding equipment setup, for a 200% load schedule, is approximately 36 hours for compression and tensile tests, and around 7 hours for lateral tests.

Q: How is a tensile load test conducted on a spun or square pile?
A: We use a special connector (anchor wedges) to secure the prestressed concrete (PC) wire or strand, allowing it to be pulled upward.

Q: Can this method be used for driven piles?
A: Yes, this method is also suitable for driven piles. Refer to Malaysia's JKR accreditation for guidance.

Q: Does the jack need to be installed at the base of the pile?
A: The placement of the jack requires careful analysis to ensure balanced upward and downward capacity, so it's not always necessary to install the jack at the base.

Q: What if the pile is already constructed? Can this method still be applied?
A: Since the jack must be installed within the rebar cage, completed bored piles can only be tested using the kentledge or reaction pile method.

Q: Is there a minimum pile diameter requirement?
A: The jack can be customized to fit any pile diameter, making it adaptable to various sizes.

Q: What are the benefits of the bi-directional load test?
A: Compared to other methods, it offers enhanced safety, time efficiency, and requires less space. For high-load and remote area projects, it is a cost-effective solution.

Q: When is the optimal time to conduct the test?
A: It is generally recommended to perform the test after the concrete has reached 28 days of age. However, depending on design considerations, it can be conducted earlier or later with designer approval.

Q: How much hammer weight do we need to conduct HSPLT @ PDA Test?
A: Minimum 1% - 2% of pile ultimate capacity; 2% is recommended for long and high-capacity piles.

Q: What is the right time to conduct the HSPLT @ PDA Test?
A: For driven piles, HSPLT @ PDA Test can be conducted directly after piling if it meets the final set criteria. For bored piles, it is highly recommended to conduct the test after the concrete strength achieves a minimum of 85%.

Q: Can we use direct capacity (RMX/RSU value) as the final pile capacity?
A: For long, non-uniform, high-capacity piles and various soil strata, RMX value can't be used as final capacity, as RMX value is only valid on uniform piles and relatively uniform soil conditions. Please note that only capacity from CAPWAP analysis results should be used.

Q: How is the pile preparation for HSPLT @ PDA Test?
A: For both driven and bored piles, ensure the pile head is level. For bored piles, it's critical to ensure the pile head is sound concrete, otherwise, hammer impact will break the pile head. For the height of the pile, a minimum of 2D is required.

Q: What happens if the pile head breaks and the required capacity is not yet achieved?
A: It's a refusal capacity, meaning the pile still has immobilized capacity. In order to mobilize higher pile capacity, higher energy (higher drop height) is required, but since the pile head is already broken, the test can't be continued.

Q: Is the CAPWAP capacity equal to pile ultimate capacity?
A: Pile capacity from CAPWAP analysis is yet mobilized ultimate pile capacity.

Q: How to get the real pile ultimate capacity with HSPLT @ PDA Test?
A: Pile ultimate capacity includes all capacity from friction and end bearing. To mobilize both capacities, ensure the pile toe moves and permanent pile head settlement occurs. To perform the test, 2% or more of hammer weight is required.

Q: Can HSPLT @ PDA Test be conducted on a raked pile?
A: Yes, it can.

Q: Can HSPLT @ PDA Test be conducted on a wooden pile?
A: HSPLT @ PDA Test can be conducted on certain varieties of hardwood as long as the actual wave speed can be checked by conducting a PIT test on pre-installed piles.

Q: How long does it take to test one pile?
A: From preparation until finishing testing takes about 30 minutes for driven piles and 1-2 hours for bored piles.

Q: How many blows are needed for each test?
A: Based on ASTM D4945, preferably apply a series of single impact blows, beginning with low drop height to check transducer function and pile stresses, then progressing to greater drop heights to mobilize additional pile capacity.

Q: Can HSPLT @ PDA Test be conducted on composite piles?
A: HSPLT @ PDA Test can be conducted on both concrete and steel piles, as well as on composite concrete and steel piles.

Q: What is the right time to conduct the LSPIT test?
A: For driven piles, the LSPIT test can be conducted directly after piling, and for bored piles, it is highly recommended to perform the test after the concrete strength has achieved a minimum of 85% and the pile head is ensured to be sound concrete.

Q: Can LSPIT determine the cause of pile integrity issues?
A: No, it can't. LSPIT merely checks for potential pile integrity issues and describes them as impedance reduction. Impedance is a function of pile area and modulus. In other words, LSPIT can't determine whether the issue is caused by area reduction and/or low concrete quality.

Q: Can LSPIT detect the actual pile length?
A: Based on the relation of wave speed and arrival time, the length of the pile can be detected, but this requires a clear pile toe during the test. However, please note that LSPIT has several limitations, as it is affected by soil resistance, which could affect a clear toe response. Incorrect wave speed could also result in incorrect interpretation.

Q: Can LSPIT detect longitudinal cracks?
A: It can't. As the stress wave travels along the pile, the wave will reflect only if it encounters a crack across the pile section that creates a gap.

Q: Can LSPIT detect the pile splice?
A: Yes, it can, but since the pile splice involves a material change (concrete to steel) and sometimes there are gaps between joint plates even if fully welded, LSPIT will notice this as impedance reduction. In this case, a PDA test is more reliable for checking the pile splice.

Q: What is the next step if there is an indication of a defective pile?
A: It is advisable to consult the issue with the designer and consultant to determine whether it is necessary to take remedial action or perform a capacity test based on the defect evaluation.

Q: Can LSPIT be performed at the pile cap?
A: It can't. LSPIT can only be conducted on a single actual pile head. However, for suspended pile caps (e.g., pile slabs, jetties, etc.) with exposed pile segments, LSPIT can still be performed using a side-attached sensor. But this method has lower accuracy than a top-mounted sensor.

Q: How many piles can be tested a day?
A: Assuming the pile head and concrete quality are good enough, 10 to 15 piles can be tested in a day.

Q: Is there any correlation between LSPIT results and pile capacity?
A: LSPIT only detects pile integrity issues without providing any pile capacity information.

Q: Can LSPIT be done on steel caps, e.g., spun or square driven piles?
A: In most cases, it works on spun piles, but on square piles, the steel cap shall be removed, and the test should be conducted on the concrete surface instead.

Q: What is the right time to conduct the USPIT test?
A: USPIT test can be conducted promptly 3 to 7 days after casting. However, it is highly recommended to conduct the test after 7 days to prevent the slow hydration process that might cause a false indication of low concrete quality.

Q: Can we use PVC pipe for USPIT testing?
A: It is not recommended to use PVC pipe, as it can shrink due to concrete hydration heat and create a debonding effect. Steel or black steel pipe is recommended.

Q: What is debonding?
A: Debonding is the bonding loss between concrete and the pipe, creating a gap in between. This gap can prevent ultrasonic waves from transmitting through, resulting in a 'false bad concrete' indication.

Q: What if PVC has already been used?
A: Ensure to circulate water inside the pipe to neutralize the heat from hydration.

Q: What if one of the pipes is blocked?
A: The test can still be conducted, but the trace correlated to the blocked pipe can only be tested up to the accessible depth.

Q: What if there is no water inside the pipe?
A: The test can't be conducted as USPIT transmits ultrasonic waves, which cannot transmit through air.

Q: What if the pipe is filled with mud?
A: It is mandatory to flush the pipe and ensure the pipe is only filled with clean water. Dirty or contaminated water could disturb the ultrasonic wave.

Q: What pipe diameter should be used?
A: A minimum of 2" (5 cm) is recommended.

Q: How many pipes should be installed?
A: A minimum of 3 pipes for a diameter of 80 cm and lower, 4 pipes for 80 cm and larger. For piles larger than 150 cm, 5 or 6 pipes are recommended.

Q: Where should the pipes be installed?
A: The pipes shall be installed inside the rebar cage and arranged evenly.

Q: Can USPIT evaluate concrete cover?

A: No, it can't. To evaluate concrete cover, a Thermal Integrity Profiler is the suitable test.

Q: How many piles can be tested a day?
A: For an average pile with a 30 m depth and 4 pipes, 6 to 8 piles can be tested a day. For piles with more than 50 m depth and 5 pipes, about 2 to 4 piles can be tested a day.

Q: What is Tube Wave Pile Integrity Test (TWPIT)?
A: TWPIT is a non-destructive testing method used to evaluate the integrity of piles, particularly focusing on detecting flaws, voids, or defects along the length of the pile. The test uses tube waves, which are a type of guided wave, to assess the condition of the pile.

Q: When should TWPIT be conducted?
A: TWPIT is typically performed after pile installation and before the pile is put into service. It can be conducted on both newly installed piles and existing piles to assess their integrity over time.

Q: How does TWPIT work?
A: TWPIT involves generating tube waves along the pile using a transducer. These waves travel down the pile shaft, and their reflections are recorded to identify changes in the pile’s cross-sectional area, indicating possible defects or irregularities.

Q: What types of defects can TWPIT detect?
A: TWPIT can detect a range of defects, including cracks, voids, necking, bulging, and other discontinuities within the pile. It is particularly effective for identifying defects that affect the pile’s structural integrity.

Q: What types of piles can be tested with TWPIT?
A: TWPIT is suitable for testing a variety of piles, including concrete, steel, and composite piles. It can be used on both cast-in-place and precast piles.

Q: What are the advantages of using TWPIT?
A: TWPIT offers several advantages, such as early detection of pile defects, the ability to test piles without the need for excavation, and providing a detailed assessment of the pile’s condition, helping to ensure the pile's long-term performance.

Q: Are there any limitations to TWPIT?
A: TWPIT may be less effective in highly heterogeneous or heavily reinforced piles where wave propagation could be complex. Additionally, interpreting the results can be challenging in certain conditions, requiring skilled personnel.

Q: How long does the TWPIT process take?
A: The duration of the TWPIT depends on the pile’s length and site conditions. Generally, the test can be completed within a few hours per pile, but this can vary based on the complexity of the project.

Q: What equipment is needed for TWPIT?
A: TWPIT requires specialized equipment, including wave generators, sensors (transducers), and data acquisition systems that capture and analyze the wave reflections within the pile.

Q: Can TWPIT be used in combination with other testing methods?
A: Yes, TWPIT can be combined with other pile testing methods such as Low Strain Pile Integrity Test (LSPIT) or Crosshole Sonic Logging (CSL) to provide a more comprehensive evaluation of the pile’s integrity.

Q: Is there a minimum pile diameter for TWPIT?
A: TWPIT can be applied to various pile diameters, but the minimum diameter depends on the equipment used and the specific project requirements. Typically, it can be used on piles as small as 300 mm (12 inches) in diameter.

Q: How accurate is TWPIT in detecting pile defects?
A: TWPIT is highly sensitive to changes in the pile’s cross-section, making it accurate in detecting defects. The accuracy, however, depends on factors like pile material, wave frequency, and the quality of the testing equipment.

Q: What should be done if TWPIT results indicate a defect?
A: If TWPIT results reveal a defect, it is important to consult with a geotechnical or structural engineer to assess the severity of the issue and determine the appropriate corrective actions, which may include further testing or remediation.

Q: Can TWPIT be applied in all soil conditions?
A: TWPIT is generally applicable in most soil conditions, but certain factors like soil stiffness and groundwater presence can influence wave propagation and should be considered during test planning.

Q: What is Hole Profiling Pile Imaging Test (HPPIT)?
A: HPPIT is a non-destructive testing method used to assess the verticality, alignment, and diameter consistency of a bored pile or drilled shaft. The test helps to ensure the integrity and proper construction of the pile.

Q: When should HPPIT be conducted?
A: HPPIT is typically performed after the pile has been drilled but before concrete is poured. It can also be conducted after concrete placement using specialized probes designed for such conditions.

Q: What are the primary objectives of HPPIT?
A: The main goals of HPPIT are to verify the pile's alignment, check for deviations in diameter, identify any irregularities in the borehole, and ensure the pile meets design specifications.

Q: How does HPPIT work?
A: HPPIT involves lowering a probe into the pile borehole. This probe uses ultrasonic or optical sensors to scan the pile's interior, capturing data on its shape, size, and vertical alignment. The data is then analyzed to produce a detailed profile of the pile.

Q: What types of piles can HPPIT be used on?
A: HPPIT can be used on bored piles, drilled shafts, and caissons of various diameters and lengths. It is versatile and suitable for a wide range of pile types.

Q: What are the advantages of using HPPIT?
A: HPPIT offers several benefits, including accurate assessment of pile geometry, early detection of construction errors, reduced risk of pile failure, and improved confidence in pile performance.

Q: Are there any limitations to HPPIT?
A: HPPIT may have limitations in highly irregular or obstructed boreholes. Additionally, the accuracy of the test can be affected by the presence of mud, debris, or groundwater in the pile borehole.

Q: How long does it take to conduct an HPPIT?
A: The time required for HPPIT depends on the pile's depth and the complexity of the site conditions. Generally, the test can be completed within a few hours for standard piles.

Q: Can HPPIT be used in conjunction with other pile testing methods?
A: Yes, HPPIT can be used alongside other pile testing methods such as CSL (Crosshole Sonic Logging) or PDA (Pile Driving Analyzer) to provide a comprehensive assessment of pile integrity.

Q: What is the minimum pile diameter that can be tested with HPPIT?
A: The minimum pile diameter for HPPIT testing depends on the probe's design and the project's specific requirements. Generally, HPPIT can be performed on piles with diameters as small as 600 mm (24 inches).

Q: How accurate is HPPIT in detecting pile defects?
A: HPPIT is highly accurate in detecting deviations in pile alignment, diameter variations, and other potential issues. Its precision depends on the quality of the equipment and the expertise of the operator.

Q: What should be done if HPPIT results indicate a problem?
A: If HPPIT results show deviations or defects, it is important to consult with the project's geotechnical engineer or structural designer to determine the appropriate corrective actions.

Q: Is HPPIT applicable for testing in all soil conditions?
A: HPPIT is generally suitable for various soil conditions, but the presence of certain soil types, like highly cohesive soils or those with significant obstructions, might affect the test's accuracy and should be considered during planning.

© Copyright 2024 MrGeoTECH. All Rights Reserved.

No Code Website Builder